home *** CD-ROM | disk | FTP | other *** search
/ Skunkware 5 / Skunkware 5.iso / tls / tls029.1.Z / tls029.1 / industry / 258 < prev    next >
Encoding:
Text File  |  1994-04-19  |  981 b   |  22 lines

  1. INTERAC - Equipment Cost - Intersoft Systems, Inc.
  2.  
  3. KEYWORDS: construction, cost accounting, Construction and Contracting            , 503     
  4.  
  5. Interac Equipment Cost module provides tracking of equipment revenue,
  6. expenses, maintenance information, and PUC taxes.  Up to five revenue rates
  7. may be assigned by equipment type or each individual equipment piece.
  8. Ninety-nine user-defined cost codes can be set up.  Detailed cost information
  9. can be stored for future report retrieval.  Each equipment piece can have nine
  10. maintenance types monitored by a series of scheduled maintenance criteria.
  11. Module interfaces with Interac Job Cost, Accounts Payable, Inventory, Purchase
  12. Order, Fixed Asset Management, Payroll, and General Ledger.  Each module has a
  13. specialized report design program providing reporting capabilities and
  14. interfacing with InterLink (import/export interface).
  15.  
  16.  
  17.  
  18. Intersoft Systems, Inc.
  19. Tel: (503) 644-3761
  20. Toll free: (800) 547-6429           
  21. Fax: (503) 626-7435
  22.